In darkness and with visibility further reduced to about 150m in fog, a container vessel was being brought to a tidal river berth under pilotage.
To monitor the vessel’s progress, the pilot had set up his portable pilotage unit (PPU). He had connected the rate-of-turn generator to the vessel’s pilot plug and had set a variable range marker on the radar with a radius of 0.5 nm. The PPU had a predictor that continually self-updated to display the vessel’s next six predicted positions at intervals of 30 seconds.
The pilot and the Master had exchanged their respective information; the passage plan, local traffic and berthing procedure (pilot) and the vessel’s condition and manoeuvring data (Master). The pilot increased the vessel’s speed in order to overcome cross-currents at the mouth of the river and then commenced a starboard turn to enter the river as normal. Soon, the vessel’s speed was about 16 knots. At this point, the Master was using the ECDIS located at the starboard conning position to monitor the vessel’s progress, while the OOW was using a paper chart.
At 2150, the pilot ordered half ahead. About two minutes later the pilot ordered 15 degrees of starboard helm to initiate the turn through the next bend in the river. He then used the predictor to assess the vessel’s rate of turn. Soon he ordered the rudder angle to be reduced to 10 degrees to starboard, then to 5 degrees and finally to midships.
At 2153:20 the vessel’s speed was near 14 knots and the rate of turn was about 25 degrees/minute to starboard. About a minute later, with the speed now 13 knots, the pilot cross-checked information from the PPU predictor with the radar. The radar information showed the vessel was not proceeding as indicated on the PPU so he ordered counter rudder to port and full ahead on the engine to stop the turn to starboard and correct the vessel’s position in the channel.
This action was insufficient and the vessel grounded at 2156, within the navigable channel but in an area where silting had been reported and that the pilot knew was present. With the rising tide the team were able to re-float and dock the vessel about two hours later.
The official investigation found, among other things, that;
- The pilot’s PPU was obtaining information from the vessel’s AIS, which was subject to GPS ‘smoothing’. As a result, the predicted vessel positions displayed on the PPU were not accurately reflecting the vessel’s future positions, but the pilot was unaware of this. Also,
- The pilot did not inform the bridge team about the extent of silting within the navigable channel nor had the bridge team taken steps to obtain this information. As such, the bridge team was unable to identify or to assist the pilot in resolving the developing unsafe situation
Lessons Learned
- Had the pilot used an independent DGPS antenna for his PPU the predicted positions would probably have been more accurate than those represented by the vessel’s AIS pilot plug.
- Communication and planning is everything! The silting in the channel was not communicated to the bridge team by the pilot – but neither did the vessel’s team take the time to research this fact which was readily available via on-line sources.
- Speed changes everything! In this case the vessel was proceeding at near 13 knots (6.68m/sec) in a narrow channel in near zero visibility. Proceeding at nine knots (4.63m/sec) would have given them extra time, about one minute, to reevaluate the circumstances and manoeuvre. This would likely have prevented the grounding
Source: The Nautical Institute
Disclaimer :
The information contained in this website is for general information purposes only. While we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Disclaimer :
The information contained in this website is for general information purposes only. While we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
About Author
Marine Insight News Network is a premier source for up-to-date, comprehensive, and insightful coverage of the maritime industry. Dedicated to offering the latest news, trends, and analyses in shipping, marine technology, regulations, and global maritime affairs, Marine Insight News Network prides itself on delivering accurate, engaging, and relevant information.
About Author
Marine Insight News Network is a premier source for up-to-date, comprehensive, and insightful coverage of the maritime industry. Dedicated to offering the latest news, trends, and analyses in shipping, marine technology, regulations, and global maritime affairs, Marine Insight News Network prides itself on delivering accurate, engaging, and relevant information.
Do you have info to share with us ? Suggest a correction
Daily Maritime News, Straight To Your Inbox
Sign Up To Get Daily Newsletters
Join over 60k+ people who read our daily newsletters
By subscribing, you agree to our Privacy Policy and may receive occasional deal communications; you can unsubscribe anytime.
BE THE FIRST TO COMMENT