What’s The Criteria For Reuse or Replacement of Auxiliary Engine Connecting Rod On Ships?

The power generated by the piston in the combustion chamber of marine engine is transferred to the crankshaft using the connecting rod. While transferring this tremendous power, the connecting rod itself is subjected to different stresses, which makes is vulnerable to damage. For this reason connectingย rodย bolts are used to joinย theย connectingย rodย and con-rodย bearing cover under the tremendous stresses generated by the runningย engine.

The most common type ofย connectingย rod that is used in the ship’s auxiliary engine is oblique or cross-cutย connectingย rod which is made of two parts.

Theย connectingย rodย of the engine must be inspected at regular intervals of time to ensure there is no defect or problem to avoid any future accidents/emergency. It’s the knowledge and skills of the engineer thatย decides whetherย to use the sameย connectingย rodย or to renew it with the spare one.

Auxiliary Engine

Following points must be considered when checking theย connectingย rodย for re-use or replacement:

1.ย Check the ovality of theย connectingย rod: Check the ovality of theย connectingย rodย by tightening both parts at its rated torque. Inside micrometerย is used to determine the correct and current ovality of the connecting rod. If the ovality is out of limits, the connecting rodย isย not to be reused.

Ovality check

2. Check connectingย rod for fretting and corrosion: Connectingย rodย to be checked for fretting and corrosion. If fretting is small, it can be removed by using oilstone. Never use grinder or scrapper for this purpose. Con-rodย with severe fretting and racks must be discarded.

3. If connecting rod with fretting is to be used, check for cracks: Minute fretting can be tolerated over the connecting for reuse only if the surface does not have any cracks. If the fretting is in small area and oil stone is used to treat the same, the complete area must be checked again by using magnaflux which detects small hairline cracks which are not visible to the naked human eye.

 

4. Check cracks between connectingย rodย and bearing cover: The serration and bore betweenย connectingย rodย and bearing cover to be checked for cracks by using die penetrating crack detection test.ย Rodย to be used only when there are no cracks detected. If there are small cracks in the connecting rod bearing cap serration, renew it with new spare one.

5. Renew connectingย rodย andย connectingย rodย bearing cover together: Connectingย rodย andย connectingย rodย bearing cover to be renewed as a whole. Never renew single part of theย connecting- rodย in case of damage as the serrations are machined in pair to locate the two halves relative to one another.

6. Re-machining of serrations should not be done: Re-machining of serrations of connecting rod /bearing cap or bore should not be done even if there is minute damage or indentation.

Connecting rod DP test

7. Bearing shell with fretting at its back should not be used: Bearing shell with fretting at it’s back side must not be used withย connectingย rod and it is to be renewed in set.

8. Ensure bolts and bearings are of same type during replacement: If theย connectingย rodย is replaced, it should be of same type and same con-rodย bolts and bearings to be used. Ensure to read the older generator data to confirm the bearing size (undersize or oversize) to be fitted while renewing the shell.

9. Replace Connecting Rod Bolts in Sets: Connectingย rodย bolts to be used and replaced in sets. If the connecting rod is renewed with the spare one, the con-rod bolts from the old con-rod must not be used with the new spare connecting rod.

10. Correct sequence and tightening torque: Once it is decided to reuse or replace the connecting rod, the engineer office must ensure that he knows the correct assembling sequence (front/ back side, pair of con-rod and bearing cap etc. ) and rated tightening torque is applied on the con-rod bolt with step- by-step tightening procedure as listed in the manual.

The assessment of connecting rod for reusing/ discarding is a critical decision to make for the ship’s engineer officer. A slight mistake in makingย the correct choice may lead to major generator damages and sometimes even causality.

The above mentioned areย some of the important basic checks which should be performed by the engineer to upkeep the generator’s long life and efficient performance.

Do you know any other important point that can be added to this list?

Let’s know in the comments below.

Disclaimer :
The information on this website is for general purposes only. While efforts are made to ensure accuracy, we make no warranties of any kind regarding completeness, reliability, or suitability. Any reliance you place on such information is at your own risk. We are not liable for any loss or damage arising from the use of this website.

Disclaimer :
The information on this website is for general purposes only. While efforts are made to ensure accuracy, we make no warranties of any kind regarding completeness, reliability, or suitability. Any reliance you place on such information is at your own risk. We are not liable for any loss or damage arising from the use of this website.

Subscribe To Our Daily Newsletter

    By subscribing, you agree to our Privacy Policy  you can unsubscribe anytime.

    About Author

    An ardent sailor and a techie, Anish Wankhede has voyaged on a number of ships as a marine engineer,...Read More ->