Watch the DolWin beta platform sailing out from Haugesund, Norway on its way to the German North Sea.
It will house the converter station for the DolWin2 HVDC link being executed by ABB. The link will have the capacity to transmit 916 megawatts (MW) of clean power into the German grid.
Reference: ABBPOWER/YouTube
Leave a Reply