GTT Concludes Contract With Vard For Supply Of LNG Tanks For Ponant Icebreaker

GTT concluded, a contract with the Norwegian shipyard VARD for the supply of the LNG tanks of the expedition ship PONANT Icebreaker. This ship, the delivery of which is planned in 2021, will be the first electric hybrid cruise ice-breaker with LNG propulsion. It will be operated by PONANT, leader in luxury polar expeditions.

Azipod_ABB_ponant icebreaker
Representation Image – Credits: abb.com

Specially designed for the specificities of the LNG as a fuel, these tanks will be equipped with GTT’s Mark III membrane technology, already widely proven in the field of LNG transportation. The Group will conduct the construction of the tanks. Accordingly, it will be in charge of selecting and coordinating its subcontractors, offering a turnkey solution to its partners VARD and PONANT.

The PONANT Icebreaker is intended for polar expeditions of durations from 2 weeks to 1 month. Thanks to its two tanks of a total capacity of 4,500 m3, this ship will be capable of making its entire routes using LNG. This performance is made possible by the compactness of GTT’s membrane containment system which optimizes the payload in very restrained spaces, thereby increasing the autonomy of the ship.

“The Ponant Icebreaker is a real world first. It is the first luxury ship with Ice Class PC2 certification ever designed, with electric hybrid engine and propelled by LNG, it is a pioneer in terms of sustainable cruising and environment protection”, says Jean Emmanuel Sauvée, CEO of PONANT.

Philippe Berterottière, Chairman and CEO of GTT declared: “This project sets an important milestone in the development of the LNG as a fuel. GTT is proud to bring its expertise to PONANT and VARD, two important players of the maritime world, for the supply of the tanks of this particularly innovative and environmentally friendly ship.”

Press Release: gtt.fr

Latest Shipping News

Leave a Reply

Your email address will not be published. Required fields are marked *