Real Life Incident: Line Breaks Six Times – When is Enough Enough?
A tanker had moored to a single point mooring (SPM) buoy ready to start discharging operations. A tug was used aft to apply tension on the vessel and keep it in line with the predominant swell during the discharging operation.