Real Life Incident: Sudden Pilot Change and Communication Gaps Cause Docking Mishap

A vessel was proceeding from anchorage to berth under pilotage. Two tugs were providing assistance; one was made fast aft and the other was used for pushing where needed.

The pilot was communicating with the tugs in the local language, which the Master did not speak. As the vessel proceeded, a second (docking) pilot boarded the vessel and quickly took over from the first pilot.

The change of pilot happened at a critical stage while the vessel was turning in a basin prior to entering the breakwater.

Credit: Nautinst

Because of this developing situation, it was not possible to carry out a Master/pilot information exchange with the second pilot. When the vessel’s bow entered the basin and the forward tug was pushing the bow to starboard, the Master realised that the vessel’s stern was not going to clear the breakwater.

He immediately ordered engines full ahead and helm hard to port, but these actions were too late to avoid contact on the vessel’s port quarter.

Since this breakwater was without fenders, the vessel suffered some minor hull damage on contact. The company investigation found that, among other things, the change of pilots at a critical stage of the manoeuvre did not allow the docking pilot enough time to become accustomed to the prevailing conditions, position, speed, rate of turn, and position/status of the tugs.

The company investigation also found that the tug orders were given by the pilots in a language other than English. This had the effect of excluding the Master, making him less aware of the developing situation. Due to this communication gap, the Master could not effectively use tugs to control the vessel’s swing.

Lessons learned

  • Occasionally, the fact that tug orders are given in a local language and are not understood by the bridge team has contributed to a bad outcome. Until this unsafe condition is addressed, these accidents will continue to occur.
  •  In this case, the company decided to reinforce their navigational audits for compliance with docking procedures by using remote VDR audits and onboard navigational audits by independent third-party auditors.

 

Do you have info to share with us ? Suggest a correction

Article Footer Banner
Article Footer Banner

Web Stories

Subscribe To Our Newsletters

By subscribing, you agree to our Privacy Policy and may receive occasional deal communications; you can unsubscribe anytime.

Leave a Reply

Your email address will not be published. Required fields are marked *