Case Study: Docking Pilot’s Actions Cited In Probable Cause of Allision

The National Transportation Safety Board issued Marine Accident Brief 20/37 Tuesday for its investigation of the Sept. 23, 2019, accident involving the tugboat G.M. McAllister and the NGL Energy Partners wharf on the Southern Branch of the Elizabeth River, near Chesapeake, Virginia.

No injuries or pollution were reported in connection with the accident. Damage to the wharf was estimated at $1.47 million.

The undocking and transit to sea of the bulk carrier Ijssel Confidence was conducted with two 4,000-horsepower tugboats, the G.M. McAllister and the Nancy McAllister. After the ship left the berth, it proceeded downriver astern in a general westerly direction toward the turning basin, with the engine dead slow astern and the rudder midship.

G.M. McAllister underway before the accident
Image Credits: Marc Piche / tugboatinformation.com

As the Ijssel Confidence approached the turning basin where the river started to bend northwest, the vessel’s astern speed continued to increase and its course over ground remained in a westerly direction. As the docking pilot attempted to slow the ship, the vessel moved towards to the south side of the river, away from Money Point, and the G.M. McAllister struck the NGL Energy Partners berth. During the NTSB’s investigation, both tugboat captains stated the Ijssel Confidence was moving too fast for the tugboats to work effectively.

The docking pilot was an experienced former tugboat captain and mate. He had docked and undocked hundreds of ships in the accident area of the river, mostly using tractor tugboats.

Docking Pilot’s Actions Cited in Probable Cause of Allision
Image Credits: ntsb.gov / Google Earth

Conventional tugboats, like those involved in this accident, are less maneuverable than tractor tugboats. In this accident, the docking pilot neglected to take into account the conventional tugboats’ reduced effectiveness and the additive effect to the ship’s speed.

The NTSB determined the probable cause of the contact of the G.M McAllister with the NGL Energy Partners berth was the docking pilot backing down the river toward the turning basin at a speed at which the assist tugboats could not be effectively used.

Press Release

Do you have info to share with us ? Suggest a correction

About Author

Marine Insight News Network is a premier source for up-to-date, comprehensive, and insightful coverage of the maritime industry. Dedicated to offering the latest news, trends, and analyses in shipping, marine technology, regulations, and global maritime affairs, Marine Insight News Network prides itself on delivering accurate, engaging, and relevant information.

About Author

Marine Insight News Network is a premier source for up-to-date, comprehensive, and insightful coverage of the maritime industry. Dedicated to offering the latest news, trends, and analyses in shipping, marine technology, regulations, and global maritime affairs, Marine Insight News Network prides itself on delivering accurate, engaging, and relevant information.

Article Footer Banner
Article Footer Banner

Subscribe To Our Newsletters

By subscribing, you agree to our Privacy Policy and may receive occasional deal communications; you can unsubscribe anytime.

Web Stories

Leave a Reply

Your email address will not be published. Required fields are marked *